World Bank Document
Transkript
World Bank Document
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP762 v7 CAMLICA ELEKTRIK URETIM A.S. CAMLICA HEPP LAND ACQUITISION REPORT ZAMANTI RIVER IN KAYSERI PROVINCE Reporting Form for Land Acquisition / Social Impacts of Portfolio Projects. Name & Location of Sub-project: Çamlıca HEPP, Zamantı River in Kayseri Province. Project Sponsor: Çamlıca Elektrik Üretim A.Ş. is the owner of the Çamlıca III HEPP project. Çamlıca Elektrik Üretim A.Ş., established in 2003, joined Akfen Group in 2007. The company is established to generate electricity with hydroelectric power plants and carrying out Çamlıca HEPP investment in Kayseri, Saraçbendi HEPP investment in Sivas . Project cost: The investment cost of Çamlıca III HEPP is 34.248.240 € (VAT and interest cost are not included) Installed generation capacity (No. units X MW/unit): Çamlıca III is a medium head power plant consisting of a 50 m high concrete (hardfill) dam with spillway, sluiceway and power intake, a transfer tunnel of 4,7 m diameter and about 3.169 m length, a surge tank of 18 m diameter and 37,40 m height, an open penstock of about 78 m length and a trifurcation leading to the powerhouse. The powerhouse is a free standing type building in a rock cut and houses 3 units Francis turbines with vertical shaft and about 8,6 MW each, i.e. 25,81 MW installed capacity and will produce approximately 75.9 GWh of power annually. Key Dates of implementation : The Public Benefit Decision has been given on April 10th, 2008 by EMRA (EPDK). General Info : Çamlıca A.Ş. initial approach for every project is to avoid social impacts, at any possible extent , particularly physical or economic displacement. The construction of project which is being supported by TSKB is currently underway and the land acquisition process has already finished. For Çamlıca III, 132.811 m2 of land will be affected, of which 13.029 m2 belongs to the Forestry Department and 119.782 m2 is privately owned. The total number of people (number of share holders of real estates) affected from expropriation is 65 and 51 of them are male, 14 of them is female. According to the land list, there were not any houses which will be affected from expropriation. The bulk of affected private land is currently used for agriculture or other productive purposes. However the amount of land planned to be expropriated (119.782 m2 for Çamlıca III HEPP) is not so much when we compare with the surrounding agricultural land. In the majority of cases, households whose land is being acquired have land elsewhere and will also be able to replace the acquired land elsewhere in the immediate area if so desired. Thus the economic impacts of land acquisition are deemed to be limited. For the expropriation of the immovable properties needed for the implementation of the project; an expropriation decision has been taken by the Energy Market Regulatory Board, pursuant to Article 15/c of the Electricity Market Law No. 4628 and Article 7 of the Expropriation Law No. 2942. Because the expropriation decision has enabled the enforcement of the “Council of Ministers Decree on the Application of Article 27 of Expropriation Law No. 2942 in the Expropriations to be Carried Out by the Energy Market Regulatory Authority” , published in the Official Gazette no. 25599 dated 30 September 2004, the Energy Market Regulatory Authority will file urgent expropriation lawsuits with the local Court of First Instance, with a request for the seizure of the immovable properties listed in the annexed list and the determination of expropriation fees. The estimated expropriation fees to be determined as a result of the on-site examination to be performed by the court expert witnesses as a result of these lawsuits will be listed by indicating the owners and shareholders of the immovable properties to be expropriated, and they will be deposited with the bank as ready for payment. The related persons may withdraw the expropriation fees from the mentioned bank branches, by presenting the ID cards, certificate of inheritance or power of attorney. For the finalization of these expropriation fees, the Energy Market Regulatory Authority Valuation Commission will also conduct a valuation work and conciliation meetings will be held on site through notices to be sent to the owners of properties. In order to judge the impacts of land acquisition the following points are considered; compliance with legal legislation (official document listing existing water usage rights in that region, public benefit decision for expropriation- appropriation), any evidence related to the public opposition, amount of expropriation area, land usage type (agricultural, pasture, forestry, arid), number of affected persons, and investing company’s intention for voluntary sale. Furthermore progress report of the project owner is followed, which informs the actual expropriation state. Inventory of Land & Assets Acquired from Private Owners : The table is given in attached excel file, because the table has too many columns so that, it doesn’t fit into word format. Inventory of Public, Community, or State Land Acquired : The table is given in attached excel file, because the table has too many columns so that, it doesn’t fit into word format. Public Awareness, Consultations, and Communication : In accordance with the EIA requirements in Turkey, Çamlıca Elektrik ÜretimA.Ş. has held public hearing sessions for affected communities at its hydropower project sites. A Public Participation Meeting was held on April 28, 2010 in Çavdaruşağı Village of Yahyalı Town. Invitations were announced in local and regional newspapers in advance. At the public opinion hearing sessions, available information about the project including the social and economic impact of the project were provided to the public. Environmental concerns and mitigation measures, technology proposed and detailed explanation of the applicable regulations was provided.. The meetings were followed by a site visit. Key issues raised by stakeholders at these meetings included requests for maximizing local employment, requests for further information regarding the land acquisition procedure and whether water from the impoundments might be used for irrigation purposes. In response to these questions, the company has hired local people wherever possible (roughly half the construction labour force comes from surrounding villages), has provided additional information on the land acquisition process and has indicated that it will discuss with Government the possibility of providing additional access across the Zamantı River and whether water could in future be used for irrigation purposes. The construction of plant will have limited effects on the demographic conditions since the number of workers in the construction phase will be 250 people. A total of 15 people will be employed during the operation phase of the project. The personnel to be employed during the construction and operation phase will create employment for people in the project region which will contribute to income and livelihood of the local population. The Project activities will not be causing any physical damages such as destroying of land of economical value (agricultural land, fruit gardens, shopping area) and/or public land such as forest area , land of cultural value or land housing infrastructure that would negatively affect the socio-economic environment in the Project region. There are no residential units within the project sites hence no re-settlement action will be required for the project activity. The project will not cause any changes in the current transportation system in the region. The Project is not expected to cause any major health risks on the population in the project region during the operation phase. All sorts of wastes will be handled safely and without public contact according to the national regulations. The personnel will be receiving health checks periodically in order to minimize the risk of an out-break of a communicable disease. The stakeholders in the meeting were mostly the representatives of local administrative units mainly village heads (muhtar) from surrounding villages and the villagers. All the headings were held in Turkish. The environmental and social aspects were discussed by the stakeholders and clarifications were sought. The overall response to the project was positive. The environmental and social aspects were discussed by the stakeholders and clarifications were sought. The overall response to the project was positive. Some points have been emphasized by the stakeholders such as the village roads near the Project regions and employment of local people for the Project. The questions regarding employment were answered by the project participant. The PP stated that during the construction process, employees will be provided from local people. However, since the single computerized system requires certain skills, much qualified people will be necessary at the operation process. The Project team ensured that all relevant national legislation will be respected and complied during the Project activities. Stakeholder engagement beyond the EIA meetings and one-on-one discussions around land acquisition has been relatively informal to date, but based on interviews with community leaders, community-project relations are positive, mainly due to the large proportion of locally employed persons active at this phase of project development. Community concerns and requests for assistance are directed to Akfen Enerji staff members. A range of corporate social investments has been made at each of the two projects currently under construction; these include elements such as road improvements, donation of computers to local municipal libraries, construction of new village access routes and the like. TSKB’s review indicates that local communities are supportive of these developments and that no community resistance to the construction of these projects has been identified to date. This is based on the outcomes of public hearings and TSKB site-level meetings with community leaders and some affected parties. Status of Land Acquisition : The The table is given in attached excel file, because the table has too many columns so that, it doesn’t fit into word format. Other Measures or Assistance provided (beyond cash compensation) : A range of corporate social investments has been made at the project currently under construction; these include elements such as road improvements, renewing school and mosques, donation of computers to local municipal libraries, construction of new village access routes, etc. The company has hired local people wherever possible. (most of the construction labour force comes from surrounding villages) Identification of Vulnerable People : There are no vulnerable people inhabiting the Project area. It has been determined via meeting with Village Headmen. Grievance Redress : There is no grievance until now for the construction of our HEPP project. The relations between the people at the construction site and the villagers and headmen are held positive all the time. Local people generally complaint to village headmen when there is a problem related with the project or any other issue related with daily life, and the village headmen makes the necessary action related with the complaints. In other words, the village headmen is the key person to register grievances or complaints, and he/she makes the necessary steps to solve the problems. Discussions with village Headmen and affected persons confirmed that the EIA consultation meetings have been the primary source of project information to date for local communities. In addition to the formal EIA meetings, a series of informal meetings have been held with all households whose land or homes are to be impacted by the project, in order to define the extent of affected property and to define and negotiate compensation amounts. Stakeholder engagement beyond the EIA meetings and one-to-one discussions around land acquisition has been relatively informal to date, but based on interviews with community leaders, community-project relations are positive, mainly due to the large proportion of locally employed persons active at this phase of project development. KAMULAŞTIRILACAK TAŞINMAZ MALLAR LİSTESİ (ALAN-m 2) LİST OF REAL ESTATE TO BE EXPROPRIATED (m 2) 1 2 3 4 5 NİTELİK OWNERSHIP PRIVATE OWNERSHIP PRIVATE OWNERSHIP PUBLIC OWNERSHIP (USED BY THIRD PARTIES) PUBLIC OWNERSHIP (USED BY THIRD PARTIES) PUBLIC OWNERSHIP (NOT USED BY THIRD PARTIES) FORESTARY AREA (NOT USED BY THIRD PARTIES) TOPLAM Türü Type OPEN NEGOTIATION EXPROPRIATION OPEN NEGOTIATION COURT DECISION APPROPRIATION APPROPRIATION Status Completed Completed Completed Not Completed Completed Not Completed Completed TOPLAM(m2) TOTAL AREA 14,932.060 104,850.560 13,028.760 Completed Not Completed 132,811.320 1 KAYSERİ 2 KAYSERİ 3 KAYSERİ 4 KAYSERİ 5 KAYSERİ 6 KAYSERİ 6 KAYSERİ 7 KAYSERİ 8 KAYSERİ 9 KAYSERİ 10 KAYSERİ 11 KAYSERİ YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI 13 AMLICA III HE KAYSERİ YAHYALI KAYSERİ 15 KAYSERİ 16 KAYSERİ 17 KAYSERİ 59 RATE OF SHARE GÜLİSTAN ERDİL 1/1 YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI YAHYALI BALCIÇAKIRI M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A06D-11A 113 60 HACI KARABULUT 1/1 113 61 AHMET KARABUĞA 1/1 113 62 İBRAHİM AKGÜN 1/1 113 63 MEHMET AKGÜN 1/1 113 64 VEYSEL AKGÜN 1/1 113 65 HASAN SAPMAZ 1/1 113 66 EŞE AKÇAKOCA 1/1 113 67 EŞE AKÇAKOCA 1/1 113 68 EŞE AKÇAKOCA 1/1 113 69 HATİCE AKÇAKOCA 1/1 113 70 ALİ AKÇAKOCA 1/1 113 71 MEHMET AKÇAKOCA 1/1 113 72 EŞE AKÇAKOCA 1/1 113 73 İBRAHİM AKÇAKOCA 1/1 113 74 CUMA EKİM 1/1 113 75 HALİL EKİM 1/1 113 76 HALİL EKİM 1/1 TOTAL AREA (m²) EXPROPRIATED AREA (m²) 4,068.85 n.a M35A11A 12 AMLICA III HE KAYSERİ 14 113 NAME - SURNAME TYPE OF REAL ESTATE BALCIÇAKIRI OWNERS Owner’s/user ’s total land holding (ha); % taken for project. YAHYALI PLOT NO DISTRICT POINT NO TOWN SECTION NO PROVINCE EXPROPRIATION LIST n.a n.a TARLA 4,068.85 TARLA 1,033.84 BAHÇE 460.72 n.a BAHÇE 1,988.05 n.a BAHÇE 688.39 n.a BAHÇE 5,308.21 n.a 1,180.06 n.a BAHÇE 3,289.15 n.a BAHÇE 871.63 n.a BAHÇE 925.22 n.a BAHÇE 4,965.36 n.a BAHÇE 1,396.55 n.a n.a 1,117.32 175.89 1,117.32 175.89 n.a BAHÇE 2,056.09 n.a BAHÇE 1,494.72 n.a BAHÇE 1,183.94 n.a TARLA 477.01 1,033.84 460.72 1,988.05 688.39 5,308.21 1,180.06 3,289.15 871.63 925.22 4,965.36 1,396.55 1,117.32 175.89 2,056.09 1,494.72 1,183.94 477.01 REASON FOR EXPROPRIATION SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) STATUS COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED TYPE OF TRANSFER KAYSERİ YAHYALI BALCIÇAKIRI M35A11A 113 77 MEHMET EKİM 1/1 113 78 MUSA KARABUĞA DURAN KARABUĞA 1/2 1/2 YAHYALI BALCIÇAKIRI 20 KAYSERİ YAHYALI YEŞİLKÖY M35A11A 130 1 ALİ AKKOYUN 1/1 21 KAYSERİ YAHYALI YEŞİLKÖY M35A11A 130 3 BEKİR ÇALIM 1/1 22 KAYSERİ YAHYALI YEŞİLKÖY M35A11A 130 4 EMİNE GÖKAY 1/1 KAYSERİ YAHYALI YEŞİLKÖY M35A11A 130 5 BEKİR ÇALIM 1/1 KAYSERİ YAHYALI YEŞİLKÖY M35A11A 130 6 MEHMET CANSEVER 1/1 25 KAYSERİ YAHYALI YEŞİLKÖY M35A11A 129 19 DURMUŞ ALİ GÖKAY 1/1 26 KAYSERİ YAHYALI YEŞİLKÖY M35A11A 129 22 MUSTAFA GÖKAY 1/1 27 KAYSERİ YAHYALI YEŞİLKÖY 129 23 AYŞE FATMA ÇAKO 1/1 28 KAYSERİ YAHYALI YEŞİLKÖY 129 26 HÜSEYİN İLÇİN 1/1 YAHYALI YEŞİLKÖY 129 27 MEHMET İLÇİN 1/1 YAHYALI YEŞİLKÖY 129 28 ALİ İLÇİN 1/1 YAHYALI YEŞİLKÖY 129 29 BAYRAM İLKİN 1/1 YAHYALI YEŞİLKÖY 128 53 MUSTAFA YAHŞİ 1/1 YAHYALI YEŞİLKÖY 128 54 ZİYA YAHŞİ 1/1 YAHYALI YEŞİLKÖY 128 55 AYŞE AKKOYUN 1/1 YAHYALI YEŞİLKÖY 128 56 İBRAHİM SARIBOĞA 1/1 YAHYALI YEŞİLKÖY 128 57 FATMA ÇALIM 1/1 YAHYALI YEŞİLKÖY 128 61 YUSUF ÇAKAR 1/1 YAHYALI YEŞİLKÖY 128 65 ABDURRAHMAN AKBOĞA 1/1 YAHYALI YEŞİLKÖY 128 66 AHMET İLÇİN 1/1 YAHYALI YEŞİLKÖY 128 67 ALİ İLÇİN 1/1 YAHYALI YEŞİLKÖY 128 68 HÜSEYİN İLÇİN 1/1 YAHYALI YEŞİLKÖY 128 69 MEHMET İLÇİN 1/1 YAHYALI YEŞİLKÖY 128 70 DURSUN İLÇİN 1/1 YAHYALI YEŞİLKÖY 128 71 SÜLEYMAN GÖKAY 1/1 YAHYALI YEŞİLKÖY 128 72 BAYRAM AKBOĞA 1/1 YAHYALI YEŞİLKÖY 128 73 HACI AKBOĞA 1/1 YAHYALI YEŞİLKÖY 128 74 KADER AKBOĞA 1/1 19 KAYSERİ 23 24 29 30 KAYSERİ KAYSERİ 31 KAYSERİ 32 KAYSERİ 33 KAYSERİ 34 KAYSERİ 35 36 KAYSERİ KAYSERİ 37 KAYSERİ 38 KAYSERİ 39 40 41 KAYSERİ KAYSERİ KAYSERİ 42 KAYSERİ 43 KAYSERİ 44 45 46 47 KAYSERİ KAYSERİ KAYSERİ KAYSERİ M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M35A11A M34B15C n.a BAĞ n.a BAHÇE 911.33 911.33 1,326.06 1,326.06 n.a BAĞ 1,435.28 1,435.28 n.a BAHÇE 2,183.05 2,183.05 n.a BAHÇE 2,805.74 2,805.74 2,957.08 2,957.08 6,840.49 6,840.49 n.a n.a BAHÇE BAHÇE n.a BAĞ 981.54 218.16 n.a BAĞ 1,136.00 380.05 n.a BAĞ 1,747.25 n.a BAĞ 2,051.56 n.a n.a BAĞ TARLA 2,071.12 2,543.28 n.a BAHÇE 920.42 n.a BAHÇE 1,071.41 n.a BAĞ n.a BAHÇE n.a n.a BAHÇE BAHÇE 508.25 4,097.60 1,294.87 3,307.41 n.a BAHÇE 2,292.94 n.a BAHÇE 352.54 n.a n.a n.a BAĞ BAHÇE BAHÇE n.a BAĞ n.a BAHÇE n.a n.a BAHÇE TARLA n.a n.a 1,252.21 388.19 816.47 1,240.01 357.77 1,463.08 398.77 3,905.96 TARLA 1,519.84 633.67 1,365.22 1,662.93 1,960.55 920.42 1,071.41 508.25 4,097.60 1,294.87 2,142.42 231.33 220.44 1,252.21 388.19 816.47 1,240.01 357.77 1,463.08 398.77 905.84 220.47 SANTRAL YERİ (POWERHOUSE AREA) SANTRAL YERİ (POWERHOUSE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED EXPROPRIATION 18 48 49 50 51 KAYSERİ KAYSERİ KAYSERİ KAYSERİ 52 KAYSERİ 53 KAYSERİ 54 KAYSERİ 55 56 KAYSERİ KAYSERİ 57 KAYSERİ 58 KAYSERİ 59 KAYSERİ 60 KAYSERİ 61 KAYSERİ 62 KAYSERİ 63 63 KAYSERİ KAYSERİ YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI YEŞİLKÖY YAHYALI ÇAMLICA M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C M34B15C 101 117 ABDURRAHMAN AKBOĞA 1/1 101 118 AHMET İLÇİN 1/1 101 119 MEHMET İLÇİN 1/1 101 121 ŞENOL İLÇİN 1/1 101 122 VELİ GÖKAY 1/1 101 123 ABDURRAHMAN AKBOĞA 1/1 101 124 CUMA NAZLI 1/1 101 125 ELİF NAZLI 1/1 101 126 KADİR İLÇİN 1/1 101 127 ESER NAZLI 1/1 101 128 AHMET VARDAR 1/1 101 129 İBRAHİM KARASLAN DURAN KARASLAN 1/2 1/2 101 130 DUDU ÖĞÜT 1/1 101 131 FADİŞ VARDAR 1/1 101 132 ALİ OSMAN ÖĞÜT 1/1 101 133 SÜLEYMAN ÖĞÜT 1/1 150 9 HACI ATMACA 1/1 n.a n.a n.a n.a TARLA TARLA TARLA TARLA 7,729.30 1,041.39 1,554.39 3,273.39 n.a TARLA 1,883.19 n.a TARLA 2,245.39 n.a TARLA 1,524.33 n.a n.a TARLA TARLA 1,282.84 4,069.77 n.a TARLA 1,125.47 n.a TARLA 1,597.84 n.a TARLA n.a TARLA n.a TARLA 3,509.42 1,314.51 803.78 n.a TARLA 1,996.78 n.a n.a BAHÇE 3,351.00 13,752.00 942.60 1,041.39 1,178.76 3,273.39 1,883.19 2,245.39 1,524.33 1,282.84 4,069.77 1,125.47 1,597.84 3,509.42 1,314.51 803.78 1,996.78 3,351.00 13,752.00 BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) BARAJ GÖL ALANI (DAM LAKE AREA) COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED COMPLETED LAND USERS NAME - SURNAME RATE OF SHARE TYPE OF REAL ESTATE PLOT NO DISTRICT POINT NO TOWN SECTION NO PROVINCE LIST OF PUBLIC LANDS TOTAL AREA (m²) ACQUISITI ON AREA (m²) REASON FOR ACQUISITION YAHYALI 1 KAYSERİ YEŞİLKÖY M35A11A 101 120 MALİYE HAZİNESİ TAM HAM TOPRAK 460.70 460.70 LAKE AREA YEŞİLKÖY M35A11A 129 24 MALİYE HAZİNESİ TAM YEŞİLKÖY M35A11A 130 2 MALİYE HAZİNESİ TAM ÇALILIK 4571.09 ÇALILIK 542.93 199.74 LAKE AREA 542.93 LAKE AREA ÇAMLICA M35A11A 150 10 MALİYE HAZİNESİ TAM FUNDALIK 114039.00 11825.39 DAM BODY YAHYALI 2 KAYSERİ 3 KAYSERİ YAHYALI YAHYALI 4 KAYSERİ STATUS EMRA's APPROVAL HAS BEEN OBTAINED EMRA's APPROVAL HAS BEEN OBTAINED EMRA's EMRA's APPROVAL HAS BEEN OBTAINED TYPE OF TRANSFER APPROPRIATION APPROPRIATION APPROPRIATION APPROPRIATION